A location hierarchy that matches the plant
Each project follows a practical chain: project, installation, plant or unit, system or section, then asset. Several locations can live in one project, and a default project brings you back to yesterday’s work.
- Switch between projects without mixing their records
- Parent relationships where the asset needs them
- Captures stay tied to the operational location